Tyrida cooperated with many enterprises from aero engine manufactuer in China and apllied LSP to kinds of turbine blades.
The fatigue strength of the blade is increased by 15% to 40% after LSP, and the LSP process cost is only 1/10 of the blade manufacturing cost. The factors of the blade after LSP are better than orginal blades without LSP process.
|